Duration of Bathroom Renovation?
For those who've gutted a bathroom.... approximately how long is the process from start to finish assuming you have all materials already and the crew works every day of the week.
The bathroom is a small full bath, no tub. Just stand up shower.
TIA!
|
Posted 10/18/09 2:43 PM |
| |
|
Prudential Douglas Elliman Real Estate
Long Island's Largest Bridal Resource | Long Island Weddings |
csorisi
My 2 LOVES

Member since 11/05 1984 total posts
Name: Corinne
|
Re: Duration of Bathroom Renovation?
My bathroom took about 1 1/2 and we put in a standing shower that wasn't there before.
|
Posted 10/18/09 3:12 PM |
| |
|
Sherwood
LIF Adult

Member since 8/08 1643 total posts
Name: s
|
Re: Duration of Bathroom Renovation?
Ours took 2 1/2 weeks, fully gutted.....it was a small bathroom with only stall-shower as well.
|
Posted 10/18/09 5:11 PM |
| |
|
nov04libride
big brother <3

Member since 5/05 14672 total posts
Name: Me
|
Re: Duration of Bathroom Renovation?
about 2 weeks
|
Posted 10/18/09 5:20 PM |
| |
|
zuzuspetals
LIF Adolescent
Member since 1/07 812 total posts
Name:
|
Re: Duration of Bathroom Renovation?
My crew took 7 days of working! But I had a very large bathroom, redid plumbing, double sinks, linen towers, drop in tub, major tiling, etc.
The same crew did our friends bathroom and it took 3 days! The bathroom was smaller than ours and not as much tiling.
The labor for our huge project was 4k. They were incredible!! Professional, quick beyond belief, and high quality work. Our tile supplier saw our bathroom and even hired them to do a kitchen and bathroom in one of their condos.
FM if you want the information.
|
Posted 10/18/09 9:19 PM |
| |
|
freckles
Love My Little Man!

Member since 5/07 1825 total posts
Name:
|
Re: Duration of Bathroom Renovation?
Thanks everyone!
That's a relief to know...DH was afraid we were looking at a month.
|
Posted 10/19/09 2:02 PM |
| |
|
freckles
Love My Little Man!

Member since 5/07 1825 total posts
Name:
|
Re: Duration of Bathroom Renovation?
Posted by zuzuspetals
My crew took 7 days of working! But I had a very large bathroom, redid plumbing, double sinks, linen towers, drop in tub, major tiling, etc.
The same crew did our friends bathroom and it took 3 days! The bathroom was smaller than ours and not as much tiling.
The labor for our huge project was 4k. They were incredible!! Professional, quick beyond belief, and high quality work. Our tile supplier saw our bathroom and even hired them to do a kitchen and bathroom in one of their condos.
FM if you want the information.
You've got FM!
|
Posted 10/19/09 2:08 PM |
| |
|
MrsFlatbread
Skinny jeans are in my future
Member since 6/06 10258 total posts
Name: Baby Momma
|
Re: Duration of Bathroom Renovation?
with my contractor? 3 days...
my kitchen in it's entirety, fully gutted, took less than two weeks...
|
Posted 10/19/09 2:09 PM |
| |
|