LIPA complaint letter**Updated with Letter**
Posted 12/3/2012 3:05:26 PM by hcsf

My dad wrote a letter to LIPA regarding a specific issue related to Sandy......

Who would you CC?


updated with letter:

To Whom It May Concern:

Monday October 29th 2012 will be a day Long Island will never forget. As we all know this was the day that Hurricane Sandy devastated the tri-state area and left hundreds of thousands without power for an unprecedented amount of time.

Another day that my family and I will never forget was July 13th 2012. This is the day my wife, Mary, after almost two years came home after being in the hospital for respiratory failure and in a nursing home for rehabilitation. She was able to come home because of hard work from all her healthcare providers and family. As part of her continued recovery at home, she requires an oxygen concentrator and a C-PAP machine.

In August of 2012 I submitted documentation to the Long Island Power Authority (LIPA) from Mary’s primary care physician that she requires electrically operated life-support devices. On
August 27th, 2012 we received a letter from LIPA confirming that our account had been noted that “someone in the household uses specialized medical equipment”. In this letter we were given an “exclusive” and “dedicated” “staffed 24 hours a day” phone number to call “during times of emergency”. The days following the hurricane, both my daughter and I called this “dedicated” number many times while being without power for twelve days. In calling this number we received vague and scripted information. Some of the responses we heard were “You have a downed wire in your area”, “We expect to have 85% of our customers up by Wednesday”, and “A crew has been assigned to evaluate the problem”. When my daughter was given the 85% by Wednesday response, she asked if we fell in the 85% or the 15%. She was told definitely the 85%. The 15% number was for the “hardest hit areas” Well, by that Thursday we still did not have power. Are these the type of responses we should hear as we are part of the LIPA “critical care program” during a major catastrophic event?

According to the LIPA letter we received and the LIPA website, it does state to “develop a plan in case timely restoration is difficult”. We did plan. We had a small thirty five year old generator that we were able to use for over a week. We had several gas cans full of gas, we had a plan to charge Mary’s portable oxygen machine during the day while the generator was on so she could use it at night, and we were able to get several additional small portable Oxygen tanks in case we ran out of gas for the generator due to the shortage. But after two and a half weeks weeks of not having power, the weather getting colder, and the additional snow storm, we needed to purchase a larger generator for $2,500 because there was no communication from LIPA to give us any convincing indication when power would be restored. Being retired and on Social Security, this was an unexpected expense. Also I felt that all that hard work and care that went into getting her to breathe without a ventilator, walking again and discharged from the nursing home might have been wasted if she relapsed because of not having adequate power for her concentrator and C-PAP for such a lengthy period of time.

We understand that this was a horrendous storm. Many families lost their homes due to fires and flooding. So for a family not to have power for twelve days it might seem insignificant. However when someone needs electricity to function daily, not having power and not having any significant communication from LIPA is massive. You should evaluate the purpose of this program and see how you can improve communication with the families that are enrolled. Nobody contacted her to see if she needed assistance. After the storm, there were several days when her aids that take care of her could not make it to the house. What would have happened if she was alone? Luckily I was here during the storm. After we did get power back, I was unexpectedly admitted into the hospital for three days. If that had happened earlier, there would have been a problem if we did not have power since she is not able to get outside to start the generator.

In conclusion after reading this letter I hope you can see the following:

• That the purpose of this program needs to be evaluated.
• Communication with the families enrolled must be increased.
• Better, up-to-date information should be given when calling the dedicated phone number.
• Follow-up with the families after any kind of major event should be instituted.

If you have any questions please feel free to contact me at my contact information above.


Print Post      Close Window