Re: Article in Newsday today about LIPA...
Posted 11/9/2012 11:24:06 AM by tara73
Posted by mama2b
Posted by NervousNell
Posted by mama2b
Sorry but this is 100% wrong...dont believe everything you read!!!
Yes because they are doing such a great job lately- they MUST have the latest technology.
I just know that this is not correct...just because you have the latest technology doesn't mean its going to get a crew to put a pole up or fix a substation.
Just speaking the truth!!!
Well, technology may not matter but neglecting to maintain infrastructure (failure to replace rotting poles, trimming trees, etc) and failure to have basic protocols (costs nothing to have a procedure in place) certainly does.
LIPA lacked basic procedures for clearing roads outside of hospitals and schools, locating and repairing downed wires, communicating with customers and keeping call centers working, maintaining poles, and trimming trees around power lines in order to prevent “tree-caused outages associated with major storm events.”
No, instead, LIPA doesn't trim back far enough or often enough, again lacking a consistent procotol, and actually STOPPED FUNDING pole inspections for almost 6 years!
LIPA spends less thinning vegetation around transmission stations than other utilities, clears less — 6 feet around distribution equipment as compared with the industry standard, which is 10 feet — and doesn’t have a consistent cycle for trimming trees. Workers might not hit some trees for seven or eight years, according to the report, which recommended a four-year cycle. LIPA stopped funding a program to inspect distribution poles in 2006. The program was supposed to restart in 2013 and scheduled to be done by 2022. The utility’s spending on transmission pole replacement dropped from $2.7 million in 2006 to less than $800,000 in 2011, according to the report.
The report also confirms their inability to communicate with their customers, something which again, procedures should be in place for and which yes, is technology based.
It also points out the differences between CT L&P, which has to answer to the gov't, and LIPA, which only answers to the board of directors. CL&P has increased proactive measures such as tree trimming, as has United Illuminating here in CT in response to criticisms post Irene/post October storm whereas LIPA didn't.
So, it is more than just technology based, but that is also a key factor.
|