Re: Vent - People's attitudes toward LIPA
Posted 11/1/2012 1:12:27 PM by tara73


Posted by sunnygirl

As a resident of the rockaway I am very upset with lipa. I expexct no power right now. However many people are saying that since we were supposed to all be evacuated, they should have cut the power before the storm hit. No one was supposed to be here so it wouldn't matter. Con ed did this in battery park. If they had cut the power transformers wouldn't have blown and there wouldn't be such devastating fires. For that I blame lipa. Not that I don't have power now


Eta they are predicting we will be without power for at least a month



This is partly what I am saying about being proactive. UI and CL&P did this here: substations were shut down to prevent catastrophic damage. When the storm and high tide passed and the threat was removed/flooding pumped out etc, they reenergized the substations. And UI TOLD us they were cutting the power, CL&P told us they were cutting power in Stamford too. They also explained to us WHY they cut the power. They explained that the flooding to a deenergized substation could be quickly repaired (within hours) but that an energized substation flooding would cause damage that would take weeks (if not longer) to repair.

Why were ConEd, Connecticut Light and Power and United Illuminating able to perform this preventative task but LIPA was not? Why wouldn't LIPA deenergize the substations to prevent damage?

Again, this is one of my problems with LIPA: Failure to be proactive.