|
Re: Fixer Upper
Posted 5/22/2006 1:21:55 PM by schnapy WE did, we could only afford a handyman special. WE made sure it fine structurally but everything else had to be redone. So far we have been in a year, the first 2 months while we lived in our apt we gutted the entire first floor. Put in a new bathroom, new sheetrock, painted, added trim and redid the wood floors. We added Central Air and Heat during the intitial rip out. We then moved in. Since then, dh is working on the basement as soon as that is finished we will gut the kitchen and then work on the outside. It can be agrevating but it can be done. After the intital work was done we are just working on furnishing one room at a time. WE also updated all the electric, Dont know what you are looking for specifically |