Re: Opinion - In What Order Would You Do These Things?
Posted 10/5/2010 7:13:22 AM by Leeners I'd do it as follows: 1. upgrading electricity and ungrounded outlets (may need spackling, holes, etc) 2. removing LR wall a/c unit and closing up hole. (again - spackling, etc) 3. exterminator (for previous ants) (after #1 and 2 so in case opening up walls for electric happens to show you some other 'friends' you'd need for the exterminator) 4. painting all rooms on first floor (which is where MBR is) (so all the spackling, holes, etc are finished) 5. Removing carpet and finishing existing hardwood floors on first floor. (last thing should be the floors b/c you will be unable to work for a few days after-especially in this weather, it'll take a while for the poly to dry) 6. installing alarm system (if you have the alarm system beforehand it may be a hassle for the workers to get in and out to complete numbers 1-5). Good luck - and post pics!! |