My Master Bath Re-Do!
Posted 9/20/2010 12:01:22 PM by Nik211

I'm not 100% done just yet - still needs a few more touches and I have to figure out the decor and accessories but the big stuff is finished (thank god!)

Here are a few pics of my master bathroom before (we thought it was a great space compared to our tiny apartment bathroom but we hated the cabinet):

External Image

External Image

External Image

External Image

I started by removing all the doors and drawers to the cabinet and then I stripped everything. (I'm pretty sure this step isn't necessary when painting but this is the process we did with our other bathroom's cabinet which we thought we would stain and ended up painting. Because that cabinet came out so well we used the same exact procedure). Then we sanded. After cleaning everything with a tack cloth (to remove all the dust) we were ready to paint. We used foam rollers made for cabinets. My DH did all the cabinet painting because he is so precise and such a perfectionist - not one roller mark, drip mark, nothing. He did an amazing job and the cabinets look like they were done by a pro.

After the cabinets were painted (we used Rustoleum's Painters Touch in Espresso Satin finish) we let them sit in our spare bathroom to cure for almost 2 weeks. I learned that different paints take different amounts of time to cure and the longer you wait the better. It gives the paint enough time to dry and harden.

In the meantime we prepped and painted the base of the cabinet and began work on the bathroom drywall. DH wanted to remove the builder grade medicine cabinet and I was a little nervous because we never did our own drywall work before. After watching a Bob Vila "How To" on You Tube (I swear to god Chat Icon) my DH felt confident enough to tackle the project himself. We removed the medicine cabinet, two towel bars and a toilet paper holder. I have to say that my DH is a natural because now he knows how to repair drywall Chat Icon We hired professionals to do patch work in our other bathroom and my DH's work could pass for theirs - you would never know we had holes in the walls!

External Image

External Image

DH also removed the light fixture and did some electrical work so we could move the fixture over to be center with the bathroom's cabinetry. The builder's did not center the light fixture over the cabinet and it drove us nuts! Since we were removing the light fixture to spraypaint it anyway DH figured now was the time to move the wiring. Again he did a terrific job.

After that we painted the bathroom. Paint color is BM Fairway Oaks.

External Image

We also bought a bathroom cabinet from Target that we assembled at home. It is perfect to store our towels in. We do not have a linen closet so this was a good solution to the problem.

We got knobs and pulls at Lowes and they were the perfect finishing touch for the cabinetry. That hardware really makes the cabinets feel like a piece of furniture! We also swapped the hardware on the Target cabinet to match.

After all of our hard work here is the master bath so far:

External Image

External Image

External Image

External Image

External Image

I think I am going to get the smaller version of the Target cabinet for our toilet room to keep extra toilet paper and wipes in. I didn't include any pictures of inside that room since it's just a toilet right now Chat Icon

Excluding the Target furniture this project cost around $200 for supplies (everything we needed for the drywall repairs, the cabinet paint, wall paint, spray paint for the light fixture, cabinet hardware and the supplies).

It was totally worth all of the work we put in. If you are thinking about doing a project like this I say go for it! Take your time to do everything right - it took us a little over two weeks but we didn't rush anything. For $200 I think we really improved the value of our bathroom!

Thanks for looking!
Print Post      Close Window