|
And so the MONEY PIT opens...
Posted 9/16/2010 10:49:46 AM by Goldi0218 Yup, contractor job #1 for Casa Goldi. Plumbing issue. Hot water wont turn off in bathroom. DH and I take piggy back showers and then he runs downstairs to the basement to shut the water off. There is a problem between the tub and the shower head. We need to demo a wall, fix it and tile it back up. Its gonna look worse than the 1952 bathroom it is now but we simply cannot afford to do our whole bathroom over while I am on leave not drawing an income. JOY. Its rare to ask for prayers on the home board, but can we all hold hands and pray that this job is finished in one day? Im still recovering from a difficult c-section incision and we only have one working bathing area until we put a stall shower in the basement. |