Re: When redoing a bathroom in your house...
Posted 8/30/2010 12:23:59 PM by freckles

We had dust EVERYWHERE! We redid an upstair bathroom at the foot of the stairs and the only rooms that weren't dusty were those with doors I could close everyday. All open rooms had dust. It traveled right down the stairs, around corners...you wouldn't believe it! And our guys were very neat.

But we have an older house so the walls were plaster and the plaster makes a much bigger mess during demo. We had a coating of dust through the entire demo and part of the rebuild when they were sanding what they'd spackled so I would say...prob 7 days out of 3 weeks there was a new layer of dust. I covered furniture I couldn't move out of the way with plastic, old blankets, you name it and closed as many doors as I could. Everything else, I scrubbed clean.

One tip too...if you have CAC, make sure to check your filters throughout the demo! We went through 3 filters during our renovation b/c the filter would suck all the dust right in everyday and if you don't clean the filter or replace them, the CAC will labor and could break down costing you $$$$. We went out and bought the cheapest filters we could find for the renovation then replaced them with good ones once the renovation was complete.

Good luck! It's totally worth it in the end!
Print Post      Close Window