|
Our Bathroom Renovation
Posted 8/29/2010 9:48:59 PM by BriBri2u so DH re-did our one and only bathroom. It took almost 3 months since he did all the reno after work and on the weekends. It was worth the time because we saved $9,000 by him doing all the work. Although, some finishing work still needs to be done - like a shower curtain and some crown molding, I wanted to show off my DH's handy work because I'm very proud of him Before During Linen Closet Before Bathroom After http://sphotos.ak.fbcdn.net/hphotos-ak-snc4/hs385.snc4/44823_1612132982149_1200995748_31736431_3181776_n.jpg |