|
Electrical Inspection
Posted 8/15/2010 9:52:58 AM by danielleandscott Do you know if the house needs to have the electrical inspected at the end of the job or does only the building inspector need to come? We had the electrical approved before the walls went up. The electrical inspector told our contractor that he didnt need to come after the sheet rock was up. I wasnt sure if I need to have him come back now that the fixtures are installed or if only I need to contact the town to have the Building inspector come for the final CO Thanks, Scott |