|
Re: Have you had your driveway blacktopped?
Posted 4/18/2006 12:03:55 PM by ODonnell 3 weeks from ripping out the old driveway, laying a new foundation of fill (filled in twice after the first layer settled) and then the layer of asphalt. They also did a Belgian block edge and apron in the 3 week period. |