Would it be a bad idea...
Posted 9/22/2009 5:16:42 PM by waiting4ablessing

to have someone come in and do the hardwood floors at the same time that someone is removing wallpaper and painting? Or should we space them out a week? And if so, which should I have come in first?
Print Post      Close Window