Renovations - what would you do?
Posted 10/2/2008 9:36:11 AM by Mimi25

We had a private contractor (friend of my Godfathers) come to our house last weekend to discuss the renovations we'd like to make to the house which are:

Kitchen - complete remode
Upstairs bathroom remodel
Adding of a 1/2 bathroom to the basement).

I saw the work he did in my Godfathers house and it was FANTASTIC!

First - Our Kitchen - it's not a functional kitchen at all! We have one countertop only and very few cabinets and I HATE IT!!! We have a dining room that is seperated by a wall that we wanted to knock down and open up to allow an L shaped kitchen to be done. He said it was possible - he even drew up the sketch of what it would look like and I have to say it looked BEAUTIFUL!

Second - Bathroom - It's small, but we knew exactly what we wanted to do. Re-tile floors and walls, add new vanity, mirror, shower door.

Third - Add a 1/2 bathroom in the basement where my DS sleeps. (this was the most expensive one)

He came back last night to give us the estimate and I was completely shocked at the price and I mean that in a GOOD way. It was less than $15K for Labor. We would be responsible for purchasing the cabinets, tiles etc, but he knows people and gets discounts on a lot of the stuff we will need. He also threw in a few things like the tub, and countertop and said he would take care of disposal of waste, and a few other things that he is throwing in as well.

Now here's what I'm wondering.
Should we just:
a) remodel the kitchen and upstairs bathroom and forget about adding a 1/2 bath downstairs

b) add the 1/2 bath and do the remodel of the kitchen, and either do the upstairs bathroom ourselves or do it at a later time?

We'd like to have all 3 done, but realistically we don't know if we'd be able to do them all right now. As much as I would love to say CHARGE IT I don't think it's a good idea right now.

What would you do?
Print Post      Close Window