Re: ENGINEER FIRST OR GET IN CONTRACT FIRST?????
Posted 6/6/2008 12:03:44 PM by NinaLemon
Posted by dpli
Posted by jgl
im worried that if we get the engineer in and pay for it that they could back out if we arent in contract
This is exactly why my attorney told us to sign the contract first, with a clause that states our offer is contingent on the inspection, including a termite inspection. He said that he didn't want us to lose our inspection $ if the owners got a higher offer while we were waiting to sign the contract and in this market, the owner might want to jump at a higher offer if there was no contract.
I did check with the Town that there were no open or missing permits on the house before we signed the contract too.
This is what we did as well, the contract was contigent on the engineers report, as well as pest and radon inspections. We could also renegoiate the price if any issues over 1K were found.
I think it's best to go into contract first - it is not difficult to get out of the contract if you have to.
ETA: We got out of a contract because the septic failed. We didn't want to deal with fixing the issue or renegoiating, so we just said we'd prefer to back out. We got our deposit back, it was very simple.
|