|
Re: ENGINEER FIRST OR GET IN CONTRACT FIRST?????
Posted 6/5/2008 10:13:05 PM by dpli
This is exactly why my attorney told us to sign the contract first, with a clause that states our offer is contingent on the inspection, including a termite inspection. He said that he didn't want us to lose our inspection $ if the owners got a higher offer while we were waiting to sign the contract and in this market, the owner might want to jump at a higher offer if there was no contract. I did check with the Town that there were no open or missing permits on the house before we signed the contract too. |