|
Re: What renovations have you done since moving in?
Posted 12/23/2005 3:21:38 PM by DjPiLL To be done in the next 3-4 months - brand new kitchen (totally gutted out) - new hardwood flooring for the entire 1st floor - all new appliances (including new washer dryer) - upgrade the heating system (either add a hot water tank or a tankless system) - remove two trees in backyard - install new larger bay window in kitchen - paint 1st floor - security system |