Re: What renovations have you done since moving in?
Posted 12/23/2005 3:21:38 PM by DjPiLL

To be done in the next 3-4 months


- brand new kitchen (totally gutted out)

- new hardwood flooring for the entire 1st floor

- all new appliances (including new washer dryer)

- upgrade the heating system (either add a hot water tank or a tankless system)

- remove two trees in backyard

- install new larger bay window in kitchen

- paint 1st floor

- security system


Print Post      Close Window