|
Re: How long from start to finish-choosing a home
Posted 2/10/2008 9:48:41 AM by shapla79 It took us almost 8 months. It would have been 5-6 months except that the first house we tried to close on fell through- the owner kept stalling on the closing date to the point that we discovered his intention was to sell the house to us and rent the lower floor from us (which was ridiculous because it was not a 2 family home and who wants to share a house with a total stranger and his 2 kids?) I found our current home within a month of the mess with the first house. But, this house also took a little longer than expected to close because the owners were getting the run around from the owners of the house they were trying to purchase. We had to extend our lease by 2 months and luckily we had a good relationship with our apartment manager. Better to start looking sooner rather than later- there are always things that are going to come up that you can't anticipate! |