Re: so we had our inspection today &...
Posted 8/6/2007 11:24:10 AM by njbound07
Posted by -DonnaMarie-
Posted by christina-and-mike07
I'm not asking for them to gut the basement for cosmetic reasons. To get to the mold they have to rip the old walls down (the entire basement is covered in wood paneling). So who should have to pay for ripping out the walls and removing the mold; putting back new sheetrock and plastering? Painting is something we expect to do. Also, they need to rip out the bathroom. That's about $5k in work alone.
As for the deck. It's about 400 sq. ft. And most contractors will charge us about $30-40 per sq. ft. to rip down the deck and replace it. the stairs are being supported by 2 bricks at the bottom. So if you were to kick the 2 bricks out from under the steps.. the entire stairs & deck will collapse. to redo the deck will cost about $12-15k. Apparently, the seller built the deck.. recenntly redoing it about 5 years ago. I can easily see the seller going bonkers when he hears that his deck is a hazard. He will definitely take offense. being that he built it. When he told us about the deck being built by him.. he took great pride in telling us this.
Right now I don't know what going to happen. I get the vibe that he doesn't give a $hit if he sells or not. Hopefully, when the inspection report get released to everyone, he will see that it's in black & white.. and will work with us on the price or giving us cash at the closing to remedy these problems. If not, we will definitely have to walk away. I will keep everyone in the loop as soon as I get new info as to what the seller wants to do.
Thanks to everyone who has offered their advice/insight.. I really appreciate all of your help.
thanks, christina
Like the other ladies mentioned, PLEASE get amold specialist in there before you do anything.
and from what you describe I don't know HOW that deck could have possibly passed inspection by the building department! no way that is built to code with unsecured bricks under it. defintely a bargaining tool.
good luck!
the mold test is for tomorrow.. so we'll know by tomorrow. oh I forgot to mention that when you look underneath the deck it does not have support underneath. no support beam in the middle.
thanks for the hugs as I really need them. I still have my heart set on this house. we expected problems as it's not a new house. it was built 1957. but it's now about negoiating the price.
|