Basement Finishing Question/Advice
Posted 10/14/2006 8:18:43 PM by LulaBell

We have a basement that is completely unfinished. It's basically a concrete cellar. And, the ceiling are low (6 feet, and DH is 6 foot tall) in one part of the basement and about 6'4" in the other half (still low I know, but better than 6 foot). Do you think it is worth it to finish the basement and have low ceilings? Our other option would be to have an engineer come and see if the foundation could be "dropped" to the other height but I am assuming that would be very expensive. I would love to have a finished basement!

Any advice is appreciated - TIA!
Print Post      Close Window